The absences show the unselected period as unfilled in the sub schedule on the right side of the screen which is correct but confusing. Those periods are unselected because they don't need to be filled, and it already shows on the side in the sub requirements (on the left side) which periods were left out so it seems unnecessary. Because they are in the sub schedule, it looks like they need to be assigned when they do not.